Barking River Wall

This contract involved stabilising flood defences at Barking and then reclaiming 280m of Barking creek using sheet piling.

This piling was then anchored back to a second sheet piled wall that was then capped to form a basement within the inner sheets and a river walk above the outer sheets.

BACK

Image 1 Image 2 Image 3

Roll over the thumbnails to view the images