Barking River Wall
This contract involved stabilising flood defences at Barking and then reclaiming 280m of Barking creek using sheet piling.
This piling was then anchored back to a second sheet piled wall that was then capped to form a basement within the inner sheets and a river walk above the outer sheets.
Roll over the thumbnails to view the images

