Case Study: Maldon
The work comprised the staged demolition of an existing Car Retail development, followed by the archaeological investigation into what possible Anglo-Saxon artifacts remained from a settlement in the then Port town.



Gants Hill
Case Study: Gants Hill
The contract involved the design & construction of an underground car park and all structural works and includes a Podium transfer slab, with a sheet piled wall solution.



Bolnore Village Bridge
Case Study: Bolnore Village Bridge
This bridge built from Pre-cast Concrete sections was the first Matiere Bridge of its type built in Britain.



Barking River Wall
Case Study: Barking River Wall
This contract involved stabilising flood defences at Barking and then reclaiming 280m of Barking creek using sheet piling.



Brentwood Gas Works
Case Study: Brentwood Gas Works
Part of an overall Anderson Design & Build contract, the regeneration of this site pulled resources from many different parts of the group, none less than Anderson Construction who provided traditional groundworks within a value engineered approach.