Maldon

Case Study: Maldon

The work comprised the staged demolition of an existing Car Retail development, followed by the archaeological investigation into what possible Anglo-Saxon artifacts remained from a settlement in the then Port town.

Click here to read more

Gants Hill

Case Study: Gants Hill

The contract involved the design & construction of an underground car park and all structural works and includes a Podium transfer slab, with a sheet piled wall solution.

Click here to read more

Bolnore Village Bridge

Case Study: Bolnore Village Bridge

This bridge built from Pre-cast Concrete sections was the first Matiere Bridge of its type built in Britain.

Click here to read more

Barking River Wall

Case Study: Barking River Wall

This contract involved stabilising flood defences at Barking and then reclaiming 280m of Barking creek using sheet piling.

Click here to read more

Brentwood Gas Works

Case Study: Brentwood Gas Works

Part of an overall Anderson Design & Build contract, the regeneration of this site pulled resources from many different parts of the group, none less than Anderson Construction who provided traditional groundworks within a value engineered approach.

Click here to read more